Soil Creep Definition
Soil Creep is a type of landslide that entails the slow and gradual movement of a soil mass (or even some loose rock) materials.
Soil Creep is a type of landslide that entails the slow and gradual movement of a soil mass (or even some loose rock) materials.
Critical Void Ratio The “Critical Void Ratio,” in soil science and geology, represents the final void ratio of a soil sample, at ultimate strength. And Critical Void Ratio is achieved by the loose and dense samples of the same soil post-shearing.
U-Shaped Kitchen U-Shaped Kitchen: A U-shaped kitchen, or a horseshoe kitchen, is a general kitchen plan layout with counters, walls, and cabinets that generally form a square-like or rectangular-like shape of the letter “u.” In the State of California (and other states with similar building code standards), U-shaped kitchens must have a minimum of 60-inches…
Hydro-Compaction Definition (Hydrocompaction) The term “Hydro-Compaction” or “Hydrocompaction” in engineering geology refers to the process whereby soils collapse upon saturation. Hydrocompaction can also be called “Hydro-Consolidation.”
Environmental Compliance Definition Environmental Compliance: Environmental Compliance is the action and fact by which an individual or business complies with every applicable environmental law, standard, code, policy, and regulation. Environmental Compliance is required for any entity to become a qualifying environmentally sustainable organization and is a priority for public health matters and business ethics. Essentially,…
Poorly Graded Soil Poorly Graded: In the soil classification process of geology, poorly graded soil represents a sedimentary soil sample that only displays one or a few of the numerous other possible grain sizes for that soil classification, in accordance with the Unified Soil Classification System (USCS). For example, a poorly graded sand (SP) may…
Control Panel in a Methane Mitigation System Control Panel of a Methane Mitigation System: A methane mitigation control panel is the brain behind the active mitigation system. In accordance with the Los Angeles Department of Building and Safety (LADBS) Methane Code, Ordinance Number 175790, a control panel synchronizes methane alarm units with sensors and the…